This document helps you quickly find relevant information about projects and their data within the PM Bridge system.
Dashboard
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Dashboard | My Projects | Displays all projects where you are an active team member. | N/A |
Dashboard | All Projects for | Allows you to view all projects for your elected Program Office, Sector, or Technology Office. Your roles determine the available locations. | N/A |
Dashboard | Only Active Projects | Displays only projects with "Active" status by default, but allows you to view all projects. | N/A |
Dashboard | Office | The CMEI Technology Office that manages the project. | PMC for FA projects, Lab Planning Tool Tool for Lab projects |
Dashboard | PMB ID | A unique number assigned to identify the project in PM Bridge. | Auto-generated from PM Bridge |
Dashboard | CID | The Prime Awardee Contract Identification number (CID) for the project. | STRIPES for FA projects |
Dashboard | Lab or FA | Identifies whether the project is a Financial Assistance (FA) or Lab project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Dashboard | BASE/IIJA | Identifies whether the project is funded from the Base CMEI budget or via the Bipartisan Infrastructure Legislation (IIJA) budget. | EDC for FA and Lab projects |
Dashboard | Project Title | The title of the project carried out under the award. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Dashboard | Project Status | The category used to define the progress of the project. | N/A |
Dashboard | Project Status: Active | Project information is released in STRIPES for FA projects. Lab Planning Tool status is active and project is in current FY for Lab projects. | N/A |
Dashboard | Project Status: Expired Budget Period | Current project date is less than project period end date of current modification in STRIPES for FA projects; this does not applicable for Lab projects. | N/A |
Dashboard | Project Status: In-Closeout | Current project date is greater than project period end date of current modification in STRIPES for FA projects and project is not closed in STRIPES, and this does not applicable for Lab project. | N/A |
Dashboard | Project Status: Closed | Project status is closed in STRIPES; this does not applicable for Lab projects. | N/A |
Dashboard | Project Status: Completed | Lab Planning Tool status is completed for LAB project. This is not applicable for FA projects. | N/A |
Dashboard | Project Start Date | The Period of Performance Start Date of the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Dashboard | Project End Date | The planned end date for the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Dashboard | Program | The Program level of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Dashboard | Activity | The level below the Program of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Dashboard | Sub Activity | The level below the Activity level of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Dashboard | WBS | The unique number assigned to a project to align the project to an office's WBS. | Auto populated based on Program, Activity, Sub-activity (first three digits); manually entered in PM Bridge for FA projects, Lab Planning Tool tool for Lab projects (fourth digit) |
Dashboard | Total Approved Budget | The current approved budget for the project calculated by a summation of the Federal Share and Recipient Share (when applicable). | STRIPES for FA projects, CPS for Lab projects |
Dashboard | Federal Share | The current cumulative federal share approved. | STRIPES for FA projects, CPS for Lab projects |
Dashboard | Recipient Share | The current total required project cost share. | STRIPES for FA projects |
Dashboard | CMEI Project Lead | The primary CMEI Project Lead on a project. | Program Official contact in STRIPES for FA projects, CMEI Project Lead contact in Lab Planning Tool tool for Lab projects |
Dashboard | Project Monitor | The primary Project Monitor assigned to the project. | Manually added to the project in PM Bridge |
Dashboard | CO | The primary Contracting Officer (CO) assigned to the project. | STRIPES for FA projects |
Dashboard | TPO | The primary Technical Project Officer assigned to the project. | Manually added to the project in PM Bridge |
Dashboard | GMS/CS | The primary Grants Management Specialist/Contracting Specialist assigned to the project. | STRIPES for FA projects |
Dashboard | Technology Manager | The primary Technology Manager assigned to the project. | Manually added to the project in PM Bridge |
Dashboard | Program Manager | The primary Program Manager assigned to the project. | Manually added to the project in PM Bridge |
Dashboard | Project Type | Identifies whether the project is Research and Development, Demonstration, Education and Outreach, or Other. | Manually entered in PM Bridge for FA and Lab projects |
Dashboard | Work Category | Describes the type of Lab project. | Lab Planning Tool tool |
Dashboard | Principal Investigator | The Principal Investigator assigned to the project. | N/A |
Dashboard | Prime Recipient | The name of the entity that is a prime recipient of a project. | STRIPES for FA projects, Lab Planning Tool Tool for Lab projects |
Project Header
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Project Header | Project Title | The title of the project carried out under the award. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Modification | Refers to the versions of the project record. | STRIPES for FA projects, Lab Planning Tool Tool for Lab projects |
Project Header | PM Bridge ID | A unique number assigned to identify the project in PM Bridge. | Generated from PM Bridge system |
Project Header | Project CID | The Prime Awardee Contract Identification number (CID) for the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Office | The CMEI Technology Office that manages the project. | PMC for FA projects, Lab Planning Tool Tool for Lab projects |
Project Header | Project Status | The category used to define the progress of the project. | N/A |
Project Header | Project Status: Active | Project information is released in STRIPES for FA projects. Lab Planning Tool status is active and project is in current FY for Lab projects. | N/A |
Project Header | Project Status: Expired Budget Period | Current project date is less than project period end date of current modification in STRIPES for FA projects; this does not applicable for Lab projects. | N/A |
Project Header | Project Status: In-Closeout | Current project date is greater than project period end date of current modification in STRIPES for FA projects and project is not closed in STRIPES, and this does not applicable for Lab project. | N/A |
Project Header | Project Status: Closed | Project status is closed in STRIPES; this does not applicable for Lab projects. | N/A |
Project Header | Project Status: Completed | Lab Planning Tool status is completed for LAB project. This is not applicable for FA projects. | N/A |
Project Header | PI Full Name | The full name of the assigned Recipient Principal Investigator (PI) for both FA and Lab projects. | PMC for FA projects, Lab Planning Tool Tool for Lab projects in the PM Bridge |
Project Header | Recipient Organization Name | The name of the entity that is a prime recipient of a project. | STRIPES for FA projects, Lab Planning Tool Tool for Lab projects |
Project Header | UEI | The Unique Entity Identifier (UEI) provides a cross-reference of Award recipient entities/organizations registered in the System for Award Management (SAM). | Only available for FA projects |
Project Header | Summary Project Description | The description of the project which captures any issues, major research and development challenges to provide an understanding of the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Program | The Program level of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Activity | The level below the Program of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Sub-activity | The level below the Activity level of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | WBS | The unique number assigned to a project to align the project to an office's WBS. | Auto populated based on Program, Activity, Sub-activity (first three digits); manually entered in PM Bridge for FA projects, Lab Planning Tool tool for Lab projects (fourth digit) |
Project Header | Lab or FA | Identifies whether the project is a Financial Assistance (FA) or Lab project. | PMC/STRIPES for FA projects, Lab Planning Tool for Lab projects |
Project Header | Project Type | Identifies whether the project is Research and Development, Demonstration, Education and Outreach, or Other. | Manually entered in PM Bridge for FA and Lab projects |
Project Header | Work Category | Describes the type of Lab project. Options include FOA Award (Prime); FOA Award (Subcontract); Operational Activity; or Lab Planning Tool Project (Direct-Funded Lab Project). | Lab Planning Tool tool |
Project Header | Lab Planning Tool ID | The unique ID assigned to the project in Lab Planning Tool tool and it is equivalent to WBS Number. | Lab Planning Tool tool for Lab projects |
Project Header | CPS Number | The CPS agreement number for the Lab project. | Lab Planning Tool Tool |
Project Header | Award Instrument | The type of legal instrument used to fund a FA project (e.g., grant or cooperative agreement). | N/A |
Project Header | Base/IIJA | Identifies whether the project is funded from the Base CMEI budget or via the Bipartisan Infrastructure Legislation (IIJA) budget. | EDC for FA and Lab projects |
Project Header | Corporate Crosscut(s) | Corporate Crosscut(s) coordinate and integrate activities where the goal and/or objectives cross more than one function or organization entity. | Manually entered in PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Office Crosscut(s) | Office crosscuts provide Technology Offices with the ability to track how projects contribute to an area of interest. | Manually entered for both FA projects and Lab projects |
Project Header | Congressional Interest Item(s) | Congressional Interest Items provide Technology Offices with the ability to track how much of a project's DOE funding contributes to areas of funding identified by Congress. | Manually edited in PM Bridge |
Project Header | Fiscal Year | The most current Fiscal Year of the Lab project. | Lab Planning Tool tool |
Project Header | Assistance Agreement Issued Date | The date the award was issued for FA projects. | PMC |
Project Header | Award Status | The current status of the project's award (i.e., Active or Closed). | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Start Date | The Period of Performance Start Date of the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | End Date | The planned end date for the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Project Header | Month of Project | Provides the current month of project as calculated from the Start and End Dates. | N/A |
Project Header | Mod Authorized Date | The date that the modification was authorized. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Edit Project Summary
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Edit Project Summary | Project Title | The title of the project carried out under the award. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Edit Project Summary | Project Description | The description of the project which captures any issues, major research and development challenges to provide an understanding of the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Edit Project Summary | Office | The CMEI Technology Office that manages the project. | PMC for FA projects, Lab Planning Tool Tool for Lab projects |
Edit Project Summary | WBS | The unique number assigned to a project to align the project to an office's WBS. | Auto populated based on Program, Activity, Sub-activity (first three digits); manually entered in PM Bridge for FA projects, Lab Planning Tool tool for Lab projects (fourth digit) |
Edit Project Summary | Fiscal Year | The most current Fiscal Year of the Lab project. | Lab Planning Tool tool |
Edit Project Summary | Program | The Program level of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Edit Project Summary | Activity | The level below the Program of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Edit Project Summary | Sub Activity | The level below the Activity level of an office's Work Breakdown Schedule (WBS). | Manually entered into PM Bridge for FA projects, Lab Planning Tool tool for Lab projects |
Edit Project Summary | WBS | The unique number assigned to a project to align the project to an office's WBS. | Auto populated based on Program, Activity, Sub-activity (first three digits); manually entered in PM Bridge for FA projects, Lab Planning Tool tool for Lab projects (fourth digit) |
Edit Project Summary | Project Type | A label or classification of a project. | Manually entered into PM Bridge for FA and Lab projects |
Edit Project Summary | Corporate Crosscut(s) | Corporate Crosscut(s) coordinate and integrate activities where the goal and/or objectives cross more than one function or organization entity (i.e., different Tech Offices working with different Labs). | Manually entered for FA projects, Lab Planning Tool tool for Lab projects |
Edit Project Summary | Add Crosscut | Provides the ability to add a Crosscut. | Only available for Financial Assistance projects |
Edit Project Summary | No Applicable Corporate Crosscut | Allows you to indicate if Corporate Crosscuts are not applicable to the project. | N/A |
Edit Project Summary | Crosscut Title | The title of the Crosscut. | N/A |
Edit Project Summary | Percent Allocation | The percent of funding that is allocated to the crosscut. | N/A |
Edit Project Summary | Office Crosscut(s) | Office crosscuts provide Technology Offices with the ability to track how projects contribute to an area of interest. | Manually entered for both FA projects and Lab projects |
Edit Project Summary | Include all Office Crosscuts as options | Allows you to select all Office Crosscuts for the project. | N/A |
Edit Project Summary | Congressional Interest Item(s) | Congressional Interest Items provide Technology Offices with the ability to track how much of a project's DOE funding contributes to areas of funding identified by Congress. | Manually edited in PM Bridge |
Edit Project Summary | Add CII | Provides the ability to add a CII to associate with the project. | N/A |
DOE Team
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
DOE Team | Is Active | Identifies whether the team member is currently active on the project. | N/A |
DOE Team | Is Primary | Displays whether the team member has been designated as the Primary PM Bridge User in the given Team Role. | N/A |
DOE Team | Team Role | The role a DOE team member has on a project. | STRIPES for CO, GMS/CS, CMEI Project Lead on FA projects; Lab Planning Tool Tool for CMEI Project Lead on Lab projects; Manually entered for all other team members in PM Bridge |
DOE Team | Name | The name of the DOE team member. | N/A |
DOE Team | The email address of the DOE team member. | N/A | |
DOE Team | Source | Identifies whether the team member was imported from a system of record or manually added in PM Bridge. | STRIPES for CMEI Project Lead, CO, GMS/CS on FA projects; Lab Planning Tool Tool for CMEI Project Lead on Lab projects; Manually added for all other team members in PM Bridge |
DOE Team | Action | Provides the ability to Edit or Delete DOE team members that have been manually added in PM Bridge. | N/A |
DOE Team | Edit | Provides the ability to set the status of the DOE team member (i.e. Active or Inactive). | Only available for manually added team members |
DOE Team | Delete | Provides the ability to delete a DOE Team Member that has been manually added. | N/A |
DOE Team | Show only Current Team | Provides the ability to either show only the active DOE team members or show the whole DOE team including both active and inactive team members. | N/A |
DOE Team | Add DOE Team Member | Provides you with the ability to manually add a DOE team member to a project. | N/A |
DOE Team: Add/Edit
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
DOE Team: Add/Edit | Team Role | The team role being assigned to a team member. | N/A |
DOE Team: Add/Edit | Assigned User | Providesthe ability toassign a user to the project team. | Search of all registered PM Bridge, restricted by selected team role |
DOE Team: Add/Edit | Start Date | Displays the start date of when the DOE Team Member was associated with the project. | N/A |
DOE Team: Add/Edit | End Date | Displays the end date of when the DOE Team Member is no longer associated with the project. | N/A |
DOE Team: Add/Edit | Primary | Provides you with the ability to designate an active team member as the Primary for the given Team Role. | N/A |
Recipient Details: Organization
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Recipient Details: Organization | Active | Identifies whether the organization is currently active on the project. | N/A |
Recipient Details: Organization | Recipient Type | Displays whether the recipient is a Prime or Subrecipient on the project. | N/A |
Recipient Details: Organization | Organization | Displays the name of the recipient organization. | STRIPES for FA projects, Lab Planning Tool Tool for Lab projects |
Recipient Details: Organization | UEI | Displays the Unique Entity ID for an Organization on a FA project. | STRIPES |
Recipient Details: Organization | Organization Type | Displays the type of organization. | sam.gov for FA projects |
Recipient Details: Organization | Socio-Economic Status | Displays the socio-economic status for the organization. | sam.gov for FA projects |
Recipient Details: Organization | Business Address | Displays the business address for the organization. | sam.gov for FA projects |
Recipient Details: Organization | Start Date | Displays the start date of when the organization was associated with the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Recipient Details: Organization | End Date | Displays the end date of when the organization was no longer associated with the project. | STRIPES for FA projects, Lab Planning Tool tool for Lab projects |
Recipient Details: Organization | Show only Active Organizations | Provides the ability to display only active organizations or both active and inactive organizations. | N/A |
Recipient Details: Team Members
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Recipient Details: Team Members | Is Active | Identifies whether the team member is currently active on the project. | N/A |
Recipient Details: Team Members | Is Primary | Displays whether the team member has been designated as the Primary User in the given Team Role. | N/A |
Recipient Details: Team Members | Team Role | Provides the team role that the team member has on the project. | N/A |
Recipient Details: Team Members | Name | Displays the name of the team member. | N/A |
Recipient Details: Team Members | Organization | Displays the name of the recipient organization the team member is a part of. | N/A |
Recipient Details: Team Members | Displays the email of the team member. | N/A | |
Recipient Details: Team Members | Phone Number | Displays the phone number of the team member. | N/A |
Recipient Details: Team Members | Source | Displays whether the team member is imported from a system of record or manually added in PM Bridge. | STRIPES for Principal Investigator and Business Contact on FA Projects; Lab Planning Tool Tool for Principal Investigator on Lab projects |
Recipient Details: Team Members | Start Date | Displays the start date of when the team member was associated with the project. | N/A |
Recipient Details: Team Members | End Date | Displays the end date of when the team member is no longer associated with the project. | N/A |
Recipient Details: Team Members | Action | Provides the ability to Edit or Delete Recipient team members that have been manually added in PM Bridge. | N/A |
Recipient Details: Team Members | Set as Primary | Provides you with the ability to designate a team member as the Primary for the given Team Role. | N/A |
Recipient Details: Team Members | Show only Current Team | Provides the ability to display only the active Recipient team members or display both active and inactive team members. | N/A |
Recipient Details: Team Members | Add Recipient Team Member | Provides the ability to manually add a recipient team member to a project. | N/A |
Recipient Team Member: Add/Edit pop-up
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Recipient Team Member: Add/Edit pop-up | Team Role | The team role that the team member has on the project. | N/A |
Recipient Team Member: Add/Edit pop-up | Assigned Contact | Displays the name of the individual being added as a team member. | N/A |
Recipient Team Member: Add/Edit pop-up | Primary | Provides you with the ability to designate an active team member as the Primary for the given Team Role. | N/A |
Recipient Team Member: Add/Edit pop-up | Add New Contact | Select to add an individual as a Recipient team member. | N/A |
Recipient Team Member: Add/Edit pop-up | First Name | Provide the first name of the team member. | N/A |
Recipient Team Member: Add/Edit pop-up | Last Name | Provide the last name of the team member. | N/A |
Recipient Team Member: Add/Edit pop-up | Enter the email address for the team member. | N/A | |
Recipient Team Member: Add/Edit pop-up | Phone Number | Enter the telephone number for the team member. | N/A |
Recipient Team Member: Add/Edit pop-up | Organization | Select or enter the organization for the team member. | N/A |
Recipient Team Member: Add/Edit pop-up | Add Organization | Provides you with the ability to add an organization which does not yet exist in the system. | N/A |
Recipient Team Member: Add/Edit pop-up | Organization Name | Provide the name of the Organization the team member is associated with. | N/A |
Recipient Team Member: Add/Edit pop-up | Start Date | Displays the start date of when the Recipient Team Member was associated with the project. | N/A |
Recipient Team Member: Add/Edit pop-up | End Date | Displays the end date of when the Recipient Team Member is no longer associated with the project. | N/A |
Finance
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Finance | Financials: Funding Profile | The funding overview of the project. | STRIPES for FA projects, CPS for Lab projects |
Finance | Total Approved Budget | The current approved budget for the project calculated by a summation of the Federal Share and Recipient Share (when applicable). | STRIPES for FA projects, CPS for Lab projects |
Finance | Federal Share | The current cumulative federal share approved. | STRIPES for FA projects, CPS for Lab projects |
Finance | Recipient Share | The current total required project cost share. | STRIPES for FA projects |
Financials: Costs & Obligations
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Financials: Costs & Obligations | Costs & Obligations | The obligations, costs, and payments on the project. | STARS |
Financials: Costs & Obligations | ITD Obligations | The cumulative obligations from the beginning of the project. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | ITD Costs | The cumulative costs from the beginning of the project. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | ITD Payments | The cumulative payments from the beginning of the project. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | ITD Uncosteds | The cumulative uncosted (Beg Uncosted+Obs-Costs) from the beginning of the project up until the month and year being viewed. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | Year Dropdown | Provides the ability to filter the data by a specific Fiscal Year of the Project or view all Fiscal Years. | N/A |
Financials: Costs & Obligations | View Inception to Date | This table provides a cumulative snapshot of financials over the life of the project up to the current FM-FY. It also provides a snapshot of monthly activity of Obligations, Costs, and Payments (MTD Obligations, CY Costs, CY Payments) that occurred in that specific FM-FY. | N/A |
Financials: Costs & Obligations | View Monthly Activity | This table provides a view into the Status of Financial activity in each FM-FY. It also provides a fiscal year cumulative total of Obligations, Costs, and Payments (CY Obligations, CY Costs, CY Payments) through the current FM-FY. | N/A |
Financials: Costs & Obligations | FM-FY | Displays the Fiscal Month and Fiscal Year for the Costs, Obligations, Payments, and Uncosted data. | N/A |
Financials: Costs & Obligations | Starting Uncosted Obligations | Displays the obligations available to cost at the start of the FM-FY. | N/A |
Financials: Costs & Obligations | CY Obligations | Displays the obligations made in a given year. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | CY Costs | Displays the costs incurred in a given year. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | CY Payments | Displays the payments made in a given year. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | YTD Uncosted Obligations | Displays obligations not yet costed (Starting Uncosted+Obs-Costs). | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | MTD Obligations | Displays the obligations made by month. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | MTD Costs | Displays the costs incurred by month. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | MTD Payments | Displays the payments made by month. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | ITD Obligations | Displays the cumulative obligations from the beginning of the project up until the month and year being viewed. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | ITD Costs | Displays the cumulative obligations from the beginning of the project up until the month and year being viewed. | STARS for FA projects, CPS for Lab projects |
Financials: Costs & Obligations | ITD Payments | Displays the cumulative payments from the beginning of the project up until the month and year being viewed. | STARS for FA projects, CPS for Lab projects |
Financials: Mortgage Details
PM Bridge Section | Data Label | Definition | Source |
|---|---|---|---|
Financials: Mortgage Details | Mortgage Details | Displays the Mortgage Details for a project and allows you to enter mortgage funding by adding subprograms and inputting funding amounts for out-year commitments. | N/A |
Financials: Mortgage Details | Does this project have an approved mortgage? | Indicates whether a mortgage is being used to fund the projects. | N/A |
Financials: Mortgage Details | Subprogram | Indicates the subprogram that is the source of funding for each mortgaged year of the project. | N/A |
Financials: Mortgage Details | Total (FY) | Displays the cumulative total Mortgage Funding for each Fiscal Year. | N/A |
Financials: Mortgage Details | Total (Subprogram) | Displays the cumulative total Mortgage Funding for each individual subprogram. | N/A |
Financials: Mortgage Details | Total (Combined) | The total amount of federal funding that will be mortgaged for the project. If the Total Mortgage Funding exceeds the Total Approved Budget, this value will be displayed in red. | N/A |
Contact Helpdesk