This guide helps you successfully complete the EQ-2 form within your Project Management Bridge (PM Bridge) NEPA package. Accurately filling out this form is crucial for environmental compliance and to avoid project delays.
The EQ-2 (Environmental Questionnaire 2) verifies that your EQ-1 is accurate and complete. It provides the NEPA Specialist with the information required to complete the NEPA review. Typically, the Technical Project Officer or Project Monitor completes the EQ-2. Completing it thoroughly and accurately ensures your project moves forward smoothly and complies with environmental regulations.
STEP 1: Initiate the EQ-2 Form
Within your project, navigate to the Action Panel and click the NEPA Tab.
Click the carat (>) next to your NEPA package title to reveal options for EQ-1 (showing Submitted), EQ-2 (New), and NEPA Determination (Unavailable).
To start the EQ-2, click the ellipses (...) next to the EQ-2 option and select Create the EQ-2.
The system opens the EQ-2 form for you, and its status updates to 'In Progress.'
The NEPA Status for that package becomes 'EQ-2 In Progress.'
STEP 2: Review Project Information
When you view the first page of the EQ-2, you will see the Section I: Project Information, which includes:
Project Title
State
Recipient/Organization Name
Notice of Funding Opportunity (NOFO) Number
If this field is empty, you can search through a list of available NOFO Numbers (via EDC).
CMEI Award Number (CID)
Funding Authority (required for submission).
Section I fields are read-only fields.
STEP 3: Complete the Environmental Questionnaire (EQ-1) Review
Navigate to Section II: Environmental Questionnaire (EQ-1) Review.
Question 1: Is this a review of a NOFO, NOFO Topic Area(s), or ALRD? (Yes/No. This is required for submission).
If you select Yes, ensure the NOFO document is uploaded in PM Bridge. Identify the Topic Area(s) you would like reviewed. You do not need to complete Questions 2-5.
If you select No, complete questions 2 through 5.
The default value is "No."
Question 2: Verify that the EQ-1 is complete and accurate and select all the boxes that are complete: (Multi-select. This is required for submission if you answered "No" to Question 1, and optional if you answered "Yes" to Question 1).
Options:
All locations where work will be conducted have been identified and fully described in Question 2b.
All project activities, tasks, and subtasks to be reviewed are defined, described, and accurately numbered.
Any physical product to be manufactured or fabricated is fully described, including a description of the fabrication procedure, size of the product, and materials to be used.
If any field testing or other fieldwork is to occur, the testing plan is fully described, including location, length, time, and process of testing.
All modifications to any facilities are fully described.
Supporting documentation, including the most recent SOPO, has been uploaded.
Explain why any of the above boxes are not selected. (Long text. This is required for submission if any multi-select options are not selected and you answered "No" to Question 1. It is optional if any multi-select options are not selected and you answered "Yes" to Question 1).
Question 3: Has any part of this project previously received a NEPA determination? (Yes/No. This is required for submission if you answered "No" to Question 1, and optional if you answered "Yes" to Question 1).
If you select Yes, select the appropriate box(es) and describe why you are requesting this NEPA review at this time. If you select No, proceed to Question 4.
Question 4: Is there enough information available to make a final NEPA determination for the entire award at this time? (Yes/No. This is required for submission if you answered "No" to Question 3 and "No" to Question 1. It is optional if you answered "No" to Question 3 and "Yes" to Question 1).
If you select Yes, are you requesting a final NEPA determination at this time? (Yes/No. This is required for submission if you answered "Yes" to Question 4 and "No" to Question 1).
If you answered No to either of the above questions, identify the Tasks, Subtasks, or Budget Periods you would like reviewed at this time. Then, identify the Tasks, Subtasks, and/or Budget Periods that will not be reviewed at this time, and explain why they are not ready for review. (Long text. This is required for submission if you answered "No" to "Are you requesting a final NEPA determination at this time?" or "No" to Question 4, AND you answered "No" to Question 1).
Question 5: Indicate if this NEPA review includes the following types of activities (select all that apply and confirm that they are fully described in the SOPO and EQ-1): (Multi-select. This is optional).
- Outreach, Education, Training, Data analysis, Computer modeling, Technical assistance, Preliminary engineering/design, Laboratory research, Modifications of existing facilities, Demonstration, Deployment or Field Testing, Site monitoring or characterization, Ground disturbing activities, Other work impacting the NEPA review.
STEP 4: Submit Your EQ-2 Form
When all required fields have been entered, you will be able to Submit the form.
The system will ask you to Confirm Your Submission with the message: "Are you sure you want to Submit the EQ-2?"
Confirm Submittal: If you choose "Okay" on the confirmation message, the EQ-2 Status will change to "Submitted," and the NEPA Package Status will become "EQ-2 Submitted." The ND Status will be "Not Started." You will then return to the NEPA Tab of your project, and the system will capture the details of the user who submitted the form, along with the date and time of submission.
Cancel Submittal: If you choose to "Cancel" on the confirmation message, you will return to editing the EQ-2, and the form will not be submitted.
After Submission
View Form as Read Only: Once you have submitted the EQ-2, if you view the completed form, you will only see a read-only version.
Generate EQ-2 PDF: When you submit the EQ-2 form, the system will generate it as a PDF file. All fields will be populated based on your entries in PM Bridge, and the file will be added to the PM Bridge Document Management System (DMS) for that project.
Frequently Asked Questions
1. What happens if I don't complete all required fields before attempting to submit the EQ-2?
If you have not filled in all required fields, the system will prevent you from submitting the form. You must complete all necessary information to proceed with submission.
2. Can I edit the EQ-2 form after I've submitted it?
No. Once you submit the EQ-2, it becomes a read-only version. You cannot make further edits to the form content directly.
3. How can I confirm that my EQ-2 has been successfully submitted?
Upon successful submission, the EQ-2 Status will change to "Submitted," the NEPA Package Status will update to "EQ-2 Submitted," and the ND Status will become "Not Started." You will also be returned to the NEPA Tab of your project.
4. Where can I find the PDF version of my submitted EQ-2?
The system automatically generates a PDF of your submitted EQ-2 and adds it to the PM Bridge Document Management System (DMS) for your specific project. You can find it there.