| Panel | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||
Use this guide to view, manage, and add geographical work locations for your project within the PM Bridge platform. Keeping this information accurate ensures proper reporting compliance and clear visibility of where your project work takes place. |
| Panel | ||||||
|---|---|---|---|---|---|---|
| ||||||
|
STEP 1: View Work Locations
From the PM Bridge Project Portfolio home screen, locate and open your specific project.
On the right side of the screen, find the Action Panel.
Select the Contacts tab,
Click the plus sign to expand the Locations of Work section to see your active locations dashboard.
- Locations that are added as part of an EQ-1 will be displayed on the Locations of Work Grid once the associated NEPA Package is Finalized
| Panel | ||||||
|---|---|---|---|---|---|---|
| ||||||
|
STEP 2: Add a New Work Location
Click the Add Location button to open the creation side panel.
In the Active section at the top of the panel, choose
Yes to set the location as active, or select
No the location is not currently active.
Fill in the required facility details, including the Facility Name.
Specify if the facility is the Principal Place of Performance by selecting Yes or No.
Specify if the facility is a Subrecipient site.
If configuring a Subrecipient site: Begin typing the Organization Name or UEI in the Select Subrecipient field to search for and select the organization.
If you cannot find the organization, verify that they are registered in SAM.gov, or
- Check the Add New Subrecipient box to indicate this work location is a new subrecipient, then manually enter the name.
Specify the Percentage of Work conducted at this specific location (using a value from 1 to 100).
Answer the Is Place of Performance in a Foreign Country? Question with Yes or No:
If you select Yes: You must enter both Latitude and Longitude coordinates to save. To find coordinates, search for your location in Google Maps, right-click the point, and copy the coordinates. Do not exceed 6 decimal places.
If you select No: You must provide either all physical address fields (Address, City, State dropdown, and 9-digit Zip Code) OR both Latitude and Longitude coordinates. To find your required 9-digit ZIP+4 code, enter your address into the USPS ZIP Code Lookup tool.
- Select the Location Type as either a Project Work Site or Operations Site
Finalize and submit your entries using one of the following panel options:
Save: Once you fill in all required fields, the Save button will appear.
Click Save to confirm and submit your details. You will see a confirmation message indicating your location has been successfully saved.
Reset: Click Reset to clear all entered fields and start over on the current form.
Close: Click Close to exit the side panel completely without saving your changes.
STEP 3: Manage Your Locations
Once saved, your new location will appear directly in the Locations of Work summary table.
- When adding a new location, you will see a message asking you to ensure the location is being tracked as part of a NEPA Package.
From this dashboard table, you can select any existing work location to Edit its configuration or click Add Location again to add additional sites to your project.
Frequently Asked Questions
Why am I getting an error when saving a location as the Principal Place of Performance?
You can only have one active Principal Place of Performance. Locate your current active principal site, edit or deactivate it, and then try saving your new location.Where do I find my full 9-digit ZIP code?
Use the hyperlink in the side panel or go directly to the USPS ZIP Code Lookup tool to find the official +4 digits for your address.Why are the address fields grayed out for my international location?
Foreign locations do not use standard US address fields. Toggle "Is Place of Performance in a foreign country?" to "Yes" and provide Latitude and Longitude coordinates instead.What should I do if I cannot find my Subrecipient's organization name in the search list?
First, verify that the organization is registered and active in SAM.gov. If they are registered but still not appearing, check the "Add New Subrecipient" box to manually input their name and continue with your reporting.Why is my "Save" button greyed out and unclickable?
The Save button only activates once all required fields are fully completed. Double-check that you have completed the Primary Activity description, provided a valid work percentage, and filled out either the full address or the latitude/longitude coordinates based on your foreign country selection.
Related Articles
| Content by Label | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Page properties | ||
|---|---|---|
| ||
|
| Optics Button | ||||
|---|---|---|---|---|
|
| Info | ||
|---|---|---|
| ||